About reyesconstruct

This author has not yet filled in any details.
So far reyesconstruct has created 21 blog entries.

Naples Island Permanent Seawall Repair, Phase 2

Naples Island Permanent Seawall Repair, Phase 2 Location: Long Beach, CAOwner: City of Long BeachDescription: Replacing of the existing concrete seawall, which consists of:Pre-cast concrete [...]

Naples Island Permanent Seawall Repair, Phase 22022-10-17T21:28:44+00:00

P762 CALA, San Clemente Island

P762 CALA, San Clemente Island Location: San Clemente Islands, Naval Base Coronado, CA Owner: NAVFAC Southwest Description: This project will provide construction of rotary [...]

P762 CALA, San Clemente Island2023-01-19T17:11:46+00:00

Retrofit Graving Dock, Naval Base San Diego

Retrofit the Graving Dock, Naval Base San Diego Location: San Diego, CAOwner: NAVFAC SouthwestDescription: The project was a design-bid-build to upgrade and retrofit the dock [...]

Retrofit Graving Dock, Naval Base San Diego2022-10-17T21:39:53+00:00

Colorado Lagoon Open Channel Phase 2A

Colorado Lagoon Open Channel Phase 2A Location: Long Beach, CAOwner: City of Long BeachDescription: Improvements to Colorado Lagoon are a part of a multi-phased Colorado [...]

Colorado Lagoon Open Channel Phase 2A2023-01-18T02:23:24+00:00

Oceanside Transit Center Third Track Project

Oceanside Transit Center Thirds Track Project Location: Oceanside, CA Owner: San Diego Association of Governments (SANDAG) The work added a third track and [...]

Oceanside Transit Center Third Track Project2022-10-25T20:37:49+00:00

Laguna Niguel to San Juan Capistrano Passing Siding

Laguna Niguel to San Juan Capistrano Passing Siding Location: Laguna Niguel and San Juan Capistrano, CA Owner: Orange County Transit Authority (OCTA) Description: The project [...]

Laguna Niguel to San Juan Capistrano Passing Siding2022-10-17T21:13:57+00:00
Go to Top