About reyesconstruct

This author has not yet filled in any details.
So far reyesconstruct has created 21 blog entries.

P224/P241/P242/P243 Missile Magazines, NWS Seal Beach

P224/P241/P242/P243 Missile Magazines, NWS Seal Beach Location: Seal Beach, CA Owner: NAVFAC Southwest Description: Involved the construction of three reinforced concrete, earth-covered, missile magazines [...]

P224/P241/P242/P243 Missile Magazines, NWS Seal Beach2022-10-25T20:44:25+00:00

North Area Waste Water Conveyance

North Area Waste Water Conveyance Location: MCB Camp Pendleton, CA Owner: NAVFAC Southwest Description: This $20M design-build project improved the wastewater conveyance system to [...]

North Area Waste Water Conveyance2022-10-25T20:39:40+00:00

Gallery Utilities Relocation, USACE

Gallery Utilities Relocation, USACE Location: Whittier, CAOwner: U.S. Army Corps of EngineersDescription: The work is located at the Whittier Narrows Dam Spillway in Pico Rivera, [...]

Gallery Utilities Relocation, USACE2023-01-19T17:06:12+00:00

CLARTS Stormwater and Safety Improvements

Central Los Angeles Recycling and Transfer Station (CLARTS) Stormwater and Safety Improvements Location: Los Angeles, CA Owner: City of Los Angeles Description: This project included, but [...]

CLARTS Stormwater and Safety Improvements2022-10-17T22:03:13+00:00
Go to Top