WATER/WASTE WATER
Lakewood Stormwater and Runoff Capture Project at Bolivar Park
Location: Lakewood, CA
Owner: City of Lakewood
Description: Work of the contract included, but was not limited to:
- Excavation
- Backfill
- Channel drop inlet
- Diversion structure
- Pretreatment device
- Two new pump stations
- Installation of new pumps
- Motors
- Mechanical and storm drain piping
- Valves
- Abandoning or removing existing utilities
- Pressure testing
- Pavement removal/replacement
- Obermyer Rubber Gate
- Underground storage and infiltration area
- Water quality skid
- Building expansion
Electrical equipment modifications - Instrumentation and controls
- Planting
- Irrigation
- Picnic shelters
- T-ball backstop to support the stormwater and runoff capture system
$0
Project Value
Owner: City of Lakewood
Location: Lakewood, CA